Smoke Ventilation
ADS supplied and installed a smoke ventilation system to the roof area of the BP2 building at Canary Wharf.
In total there were 13 No. single and double flap Ventilators all supplied and installed with local control panels, electrical wiring and micro swithes to allow a positive signal that each vent is fully open prior to the pressurisation system starting up. These ventilators are tested to the current EN12101 standard and can open up to 140 degrees to provide a large free area that minimises the openings that are required.
ADS also supplied and installed numerous continuous louvres to the plant wells that rise through the building and terminate at roof level.