Solar Shading
ADS designed, supplied and installed the impressive Solar Shading system to the front entrance of the new Epping Forest College.
Our system comprised of 1st fix brackets that ADS manufactured and supplied to the curtain walling sub-contractor for installation into their system. The 2nd fix consisted of vertical steelwork to fix back to the brackets and 360mm aerofoil blades to span between teh posts. We spaced the 360mm aluminium blades at 400mm centres to balance the amount light into the reception area, and the summer heat gains into the building.